This project involved the change of use from commercial to residential classification. The property, originally arranged over three floors with one room per level, required significant restoration. Situated within a nutrient neutrality catchment, we worked closely with the Peak Park Authority to ensure compliance. The existing structure suffered from extensive damp, damaged timbers, and a compromised roof. Collaborating with the builder, we fully treated the damp, replaced all damaged timbers, and installed a new slate roof with roof lights to maximise natural light throughout the home.
Today | Closed |
Copyright © 2026 Peak Building Design - All Rights Reserved.